Simulate the real exam
We provide different versions of C-TSCM42-64 practice exam materials for our customers, among which the software version can stimulate the real exam for you but it only can be used in the windows operation system. It tries to simulate the C-TSCM42-64 best questions for our customers to learn and test at the same time and it has been proved to be good environment for IT workers to find deficiencies of their knowledge in the course of stimulation.
After purchase, Instant Download: Upon successful payment, Our systems will automatically send the product you have purchased to your mailbox by email. (If not received within 12 hours, please contact us. Note: don't forget to check your spam.)
There is no doubt that the IT examination plays an essential role in the IT field. On the one hand, there is no denying that the C-TSCM42-64 practice exam materials provides us with a convenient and efficient way to measure IT workers' knowledge and ability(C-TSCM42-64 best questions). On the other hand, up to now, no other methods have been discovered to replace the examination. That is to say, the IT examination is still regarded as the only reliable and feasible method which we can take (C-TSCM42-64 certification training), and other methods are too time- consuming and therefore they are infeasible, thus it is inevitable for IT workers to take part in the IT exam. However, how to pass the SAP C-TSCM42-64 exam has become a big challenge for many people and if you are one of those who are worried, congratulations, you have clicked into the right place--C-TSCM42-64 practice exam materials. Our company is committed to help you pass exam and get the IT certification easily. Our company has carried out cooperation with a lot of top IT experts in many countries to compile the C-TSCM42-64 best questions for IT workers and our exam preparation are famous for their high quality and favorable prices. The shining points of our C-TSCM42-64 certification training files are as follows.
Fast delivery in 5 to 10 minutes after payment
Our company knows that time is precious especially for those who are preparing for SAP C-TSCM42-64 exam, just like the old saying goes "Time flies like an arrow, and time lost never returns." We have tried our best to provide our customers the fastest delivery. We can ensure you that you will receive our C-TSCM42-64 practice exam materials within 5 to 10 minutes after payment, this marks the fastest delivery speed in this field. Therefore, you will have more time to prepare for the C-TSCM42-64 actual exam. Our operation system will send the C-TSCM42-64 best questions to the e-mail address you used for payment, and all you need to do is just waiting for a while then check your mailbox.
Only need to practice for 20 to 30 hours
You will get to know the valuable exam tips and the latest question types in our C-TSCM42-64 certification training files, and there are special explanations for some difficult questions, which can help you to have a better understanding of the difficult questions. All of the questions we listed in our C-TSCM42-64 practice exam materials are the key points for the IT exam, and there is no doubt that you can practice all of C-TSCM42-64 best questions within 20 to 30 hours, even though the time you spend on it is very short, however the contents you have practiced are the quintessence for the IT exam. And of course, if you still have any misgivings, you can practice our C-TSCM42-64 certification training files again and again, which may help you to get the highest score in the IT exam.
SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 Sample Questions:
1. Which functions lead to a reduction in the capacity requirement for an individual operation at a work center? (Choose three.)
A) Posting the goods receipt for the production order
B) Confirming the operation
C) Rescheduling the operation
D) Setting the status technically complete (TECO)
E) Reducing the order quantity
2. A project team member analyzes the following situation in SAP ECC in the stock/requirements list for a finished product: there is only one customer order and one fixed planned order with a similar quantity amount. The customer order and the planned order both have deadlines on work days but not on the same work day; the planned order has a later deadline. The project team member cannot find a rescheduling message referring to this deadline misalignment in the stock/requirements list. What reasons could there be for the missing message? (Choose two.)
A) The requirement coverage element is outside the rescheduling horizon.
B) Requirement planning has not yet been carried out to update the rescheduling message.
C) The elements are linked to each other via fixed pegging.
D) The time misalignment falls within the tolerance window defined in Customizing.
3. With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)
A) Material identification and reconciliation
B) Resource selection
C) Digital signature
D) Availability check
E) Batch record
4. Which statement regarding lot size procedures is correct?
A) The procurement quantity of a lot size procedure can be specified using a safety time period profile.
B) The lot size quantity can be influenced using a minimum quantity and the rounding profile.
C) If a long-term lot size is in use, procurement is conducted with a long-term perspective.
D) If a make-to-order production strategy is in use, a lot for lot (exact) lot size is always determined for the corresponding procurement element.
5. A finished material is to be planned in a controlled manner in the SAP ECC system in the context of requirements planning. The planned orders are scheduled using what is known as basic date scheduling (not lead-time scheduling). Which of the following statements is true for the resulting dependent requirements?
A) In multi-level backward scheduling, dependent requirements are triggered at the start date for the higher-level assembly.
B) In multi-level backward scheduling, dependent requirements are triggered at the start date for the higher-level assembly planned order.
C) If individual material components are explicitly assigned to operations during BOM and routing maintenance, the requirement dates of the dependent requirements for these components are scheduled at each of the operation start dates.
D) When a customer order is created for the finished product, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
Solutions:
Question # 1 Answer: B,D,E | Question # 2 Answer: A,D | Question # 3 Answer: A,C,E | Question # 4 Answer: B | Question # 5 Answer: A |